What is the school district exception?
Under the TDLR rules, a school district project is the one case where one party may do both mold assessment and mold remediation on the same project. Outside that case, the two roles must be held by separate parties under Occupations Code Chapter 1958.
The exception is narrow. It applies to school district projects only. A shop, an office, an apartment building or a private school does not fall under it, and a firm that says the exception applies to those is describing the rule wrongly.
The exception does not remove any licensing requirement. The party doing the assessment or the remediation must still hold the license for that work, and the company must still meet the insurance requirement TDLR sets for mold companies.
Does the exception mean a school can skip the assessment?
No. The exception allows one party to do both the assessment and the remediation, but the assessment still has to be done, in writing, by a licensed consultant. The rule changes who may do both, not whether an assessment is needed.
A school district should not treat the exception as a shortcut. The assessment sets the scope and the reasons for it, and it is the record that shows what was found and why the work was done. Without it, the district has no basis for the remediation.
The district should ask for the assessment in writing before any remediation is started, even where one party is doing both parts. That habit protects the district as much as the building.
What should a district ask a licensed party before it hires?
The licenses of each party, the company license, the insurance certificate, the written scope, the method of containment and the records to be kept. The district should confirm the project is a school district project before relying on the exception.
Ask for the individual license numbers and the company license, and check each one with TDLR. Ask for the certificate of liability insurance, which TDLR requires companies to carry at a minimum of one million dollars per occurrence, and confirm it is current.
Ask how the work will be contained, how the building will be protected, and how the records will be kept. A party that cannot explain those points clearly should not be hired for a school building.
How should a district keep the records?
Keep the water event record, the assessment, the scope, the remediation records, the readings and any post-remediation check in the building file. Each record should show the party that prepared it, the license it was prepared under, and the date.
A complete file lets the district show, years later, what was found, what was done and who did it. It is also the first thing the district will need if a question about the building arises from staff or families.
Store the records where facilities staff can find them, and keep a copy with the district's record office. A file kept only by a contractor is not enough.
What affects the cost of a school district mold project?
The area affected, the number of rooms, the amount of removal, the containment needed to keep the school open, and the post-remediation check. The price is set by the licensed party in writing and explained before any work starts. This site publishes no figure.
Work that has to be done around occupied classrooms or at specific times costs more to plan and execute, because the containment and the scheduling take more effort. The district can ask for a plan that keeps disruption low, and the licensed party should explain how it will do that.
Ask for each part of the cost to be shown in writing, with the assessment, the remediation and any check listed separately, so the district can compare bids on the same scope.